04Case study · 2024
ACMV controls — retail mall
Upgraded VAV controllers across three retail levels and integrated them with the existing BMS for tenant-level temperature billing.
Commercial Orchard, Singapore 10 weeks

Sector
Commercial
Zones
84
Floors
3
Protocol
BACnet
The brief
What the client needed.
Mall stayed open daily. BMS was a legacy BACnet/IP head-end that required new gateway hardware to talk to modern VAV controllers.
Our approach
How we delivered it.
Sequenced works after mall hours, swapped 84 VAV controllers, deployed BACnet gateways and rebuilt graphics in the BMS. Calibrated temperature and CO₂ sensors per tenant zone.
Outcome
The result on hand-over.
Mall now bills tenants by measured cooling load. Average tenant complaint volume on climate dropped sharply in the first quarter.
Scope delivered
What we installed.
- 84 VAV controllers
- BACnet/IP gateways
- Temp + CO₂ sensors per zone
- BMS graphics rebuild
- Commissioning report